Skip to main content
Home

Main navigation

  • REC Home
  • Apply
    • REC Services Rate Card & Policies
    • LPFM Construction Completed
    • LPFM License Modification
    • New FM Booster Station
    • New Class D FM Station in Alaska
    • New Low Power FM (LPFM) Station
  • Initiatives
    • RM-11846: Rural NCE Stations
    • RM-11909: LP-250 / Simple 250
    • WIDE-FM
    • RM-11952: Translator Reform
    • RM-11843: 8 Meter Ham Band
    • PACE - LPFM Compliance
  • Services
  • Tools
    • Today's FCC Activity
    • Broadcast Data Query
    • Field strength curves
    • Runway slope
    • Tower finder
    • FM MODEL-RF Exposure Study
    • More tools
    • Developers - API
  • LPFM
    • Learn about LPFM
      • Basics of LPFM
      • Self Inspection Checklist
      • Underwriting Compliance Guide
      • Frequently Asked Questions
      • FCC Rules for LPFM
      • HD Radio for LPFM
      • Transmitters certified for LPFM
      • Interference from FM translators
      • RadioDNS for LPFM Stations
    • 2023 Window REC Client Portal
    • myLPFM - LPFM Station Management
    • LPFM Station Directory
    • Spare call signs
    • REC PACE Program
    • More about LPFM
  • Reference
    • Pending FCC Applications
    • FCC Filing Fees
    • Radio License Renewal Deadlines
    • FCC Record/FCC Reports
    • Pirate Radio Enforcement Data
    • Premises Info System (PREMIS)
    • ITU and other international documents
    • Recent FCC Callsign Activity
    • FCC Enforcement Actions
    • Federal Register
    • Recent CAP/Weather Alerts
    • Legal Unlicensed Broadcasting
    • More reference tools
  • LPFM Window
  • About
    • REC in the Media
    • Supporting REC's Efforts
    • Recommendations
    • FCC Filings and Presentations
    • Our Jingles
    • REC Radio History Project
    • Delmarva FM / Riverton Radio Project
    • J1 Radio / Japanese Broadcasting
    • Japan Earthquake Data
    • REC Systems Status
    • eLMS: Enhanced LMS Data Project
    • Open Data at REC
    • Our Objectives
  • Contact

Breadcrumb

  • Home

Operational Status

Michi on YouTube

Most popular

fcc.today - real time updates on application activity from the FCC Media Bureau.  fccdata.org - the internet's most comprehensive FCC database lookup tool.  myLPFM.com - Low Power FM channel search and station management tool.  REC Broadcast Services - professional LPFM and FM translator filing services. 

Other tools & info

  • Filing Window Tracking
  • Enforcement Actions
  • REC Advisory Letters
  • FAQ-Knowledge Base
  • U/D Ratio Calculator
  • Propagation Curves
  • Runway Slope/REC TOWAIR
  • Coordinate Conversion
  • PREMIS: Address Profile
  • Spare Call Sign List
  • FCC (commercial) filing fees
  • Class D FM stations in Alaska
  • ARRR: Pirate radio notices
  • Unlicensed broadcasting (part 15)
  • FMmap - broadcast atlas
  • Federal Register
  • Rate Card & Policies
  • REC system status
  • Server Status
  • Complete site index
Cirrus Streaming - Radio Streaming Services - Podcasting & On-demand - Mobile Apps - Advertising
Select FAQ Category:

FAQ: Are translators required to protect LPFM stations?

Yes. FM translator stations are required to protect LPFM stations in accordance with §74.1204(a)(4) of the rules.  FM boosters have a specific protection requirement for LPFM (and other stations) on the first-adjacent channels.

To understand these protections, a quick lesson on contours:

Each broadcast station (full power, LPFM and translator) has a protected contour (sometimes referred to as the "service contour") which (for LPFM and translators) is the 60 dBu contour using the F(50, 50) curves chart. For an LPFM station operating 100 watts at a perfect 30 meters above average terrain on flat earth, this contour will be a 5.6 km radius based utilizing a non-directional antenna. The service contour is intended to be the estimated service area of the station where the listener can expect good service.

Each broadcast station also has interfering contours. The size of these contours vary based on the adjacency of the channel from the other station being evaluated. The size of the interference contour for co-channel is much larger than the interference contours for first and second/third adjacent channels. Interfering contours use the F(50, 10) curves chart. The interfering contour is intended to determine the area where the "undesired" signal from another facility would cause interference to the estimated service area of the desired station (the service contour we mentioned above).

The distance to each curve is based on evaluating the height above average terrain (HAAT) in as many as 360 different directions (radials) and then based on the HAAT in that direction and the effective radiated power in that direction (taking into consideration that it can be reduced as a result of a directional antenna), the distance from the station to the distance calculated by using the chart is determined. All of the "dots" are connected and a contour plot is drawn.

In this example, the dots are drawn at 10 degree increments (36 points) and then a line is drawn between them to determine the service contour. Consultants generally use 72 points or if the software can support it, 360 points:

Each point is the distance to a contour for each 10 degree radial.

For predicted interference-free operation, the interfering contour of the undesired station should not overlap the protected (service) contour of the desired station.

How this applies to translators protecting LPFM stations

FM translators on the same channel (co-channel) that are applied for subsequent to the LPFM station can not specify a facility where their 40 dBu interfering contour overlaps the LPFM protected contour.

FM translators on first-adjacent channels that are applied for subsequent to the LPFM station can not specify a facility where their 54 dBu inteference contour overlaps the LPFM protected contour.

FM translators on second and third adjacent channels are not required to protect LPFM staitons.

LPFM stations that have not yet been licensed (their license to cover has not yet been granted) will be considered operating at the maximum permitted facilities (100 watts at 30 meters HAAT). Once the LPFM station is fully licensed, the actual facility must be taken into consideration. Therefore, if the LPFM station is less than 30 meters HAAT and is operating less than 100 watts (such as to satisfy a second adjacent channel waiver, in accordance with the US-Mexico agreement or due to station choice), then it will not be afforded the same protections that it had while a construction permit.

LPFM stations that are operating a directional antenna for the sole purpose of a second-adjacent channel waiver or for state, county and city public safety agencies operating a traveler's information service will be protected like they are nondirectional, even though they have a directional antenna on the records.  Some translator applicants may not catch that and could file to overlap the LPFM station's hypotheical nondirectional contour.  If this happens, then an Informal Objection needs to be filed against the translator application.  

LPFM stations that are operating a directional antenna for the purpose of international agreement, Channel 6 protection or for any other purpose will only be protected by translators to their directional service contour as opposed to a hypothetical nondirectional service contour.  This means that translators can come closer to LPFM stations.

It should also be noted that when computing the curves, all HAAT measurements below 30 meters are rounded up to 30 meters.

Real-world Example

In this example, KIND-LP is an LPFM station in Oxnard, CA that was singleton in the November, 2013 filing window. In 2015, FM translator K232EW moved their station to the west. KIND-LP is on 94.1 and K232EW is on 94.3, so this is a first-adjacent channel translator. In order for K232EW to properly protect KIND-LP, K232EW had to use a directional antenna.

The map below shows KIND-LP's protected (60 dBu) service contour in green and K232EW's first-adjacent channel (54 dBu) interfering contour in red. Since the contours do not overlap, the move is permitted under the rules:

The interference contour of the translator can not overlap the service contour of the LPFM station.

LPFM stations protect FM translators on co-channel, first-adjacent and second-adjacent channels using minimum distance separation specified in §73.807(a) of the rules. LPFM stations may use second-adjacent channel waivers similar to full-power.

LPFM enforcement and interference
FM Translators
Sat, 11/14/2020 - 12:00

§74.1204 Protection of FM broadcast, FM Translator and LP100 stations

REC Essentials

  • FCC.TODAY
  • FCCdata.org
  • myLPFM Station Management
  • REC site map

The More You Know...

  • Unlicensed Broadcasting
  • Class D Stations for Alaska
  • Broadcasting in Japan
  • Our Jingles

Other REC sites

  • J1 Radio
  • REC Delmarva FM
  • Japan Earthquake Information
  • API for developers

But wait, there's more!

  • Join NFCB
  • Pacifica Network
  • LPFM Wiki
  • Report a bug with an REC system

Copyright © REC Networks - All Rights Reserved
EU cookie policy

Please show your support by using the Ko-Fi link at the bottom of the page. Thank you for supporting REC's efforts!